| N o. |
Description |
Transcript Page |
Online |
| 1 | 3/7/94 U.S. Notice of taking deposition duces tecum of Kevin P. Boehmer and a list of documents to be produce at deposition | 7 | |
| 2 | 3/7/94 U.S. Notice of taking deposition duces tecum of Kevin P. Boehmer and a list of documents to be produce at deposition | 77 | |
| 3 | Designation of expert & fact witnesses of petitioners, Sugar Cane Growers Cooperative of Fla., Roth Farms, Inc. and Wedgworth Farms, Inc. 2/8/94. | 79 | |
| 4 | CH2M Hill proposal to conduct a microfiltration pilot study for the removal of phosphorus from surface waters in the Everglades Agricultural Area. 5/25/93. (Bates# DES 272 - 294) | 110 | |
| 5 | 8/13/93 memorandum from K. Boehmer to Jeff Ward. Re: SCGC microfiltration test sampling sites. (Bates # DES 657) | 119 | |
| 6 | 12/3/93 memorandum from E. Shannon and K. Boehmer to William Green. Re: Application of SCGC-wide phosphorus reduction BMPs/microfiltration treatment strategies. (Bates# DES 896 - 927 | 121 | |
| 7 |
Compilation
of data derived from the Co-op's 1993 early baseline data determining the
total tonnage and area loading for 1993.
2/8/94. SCGC/EBM
1993 Actual Data (Jan. 1 - Dec.
27/93) |
122 | |
| 8 | 8/19/93 fax from Steve Lavinder to Kevin Boehmer. Re: Workplan for completing the microfiltration pilot study. (Bates# DES 563 - 569) | 126 | |
| 9 | Copies of field notes dated 8/24/93 - 9/1/93. (Bates# DES 1414 - 1446) | 132 | |
| 10 | Copies of field notes and field work dated 8/24/93. (Bates# DES 1447 - 1457) | 134 | |
| 11 | 10/13/93 memorandum from E. Shannon and K. Boehmer to W. Green. Re: The microfiltration pilot study results- draft copy. (Bates# DES 718 - 803 | 135 | |
| 12 | 10/13/93 memorandum from E. Shannon and K. Boehmer to W. Green. Re: The microfiltration pilot study results- draft copy. (Bates# DES 718 - 803 | 140 | |
| 13 | 2/18/94 memorandum from E. Shannon to B. Green, J. Ward, G. Wedgworth, K. Boehmer and J. Lozier. Re: Microfiltration pilot plant testing in the EAA. | 140 | |
| 14 | 10/29/93 technical memorandum from E. Shannon and K. Boehmer to W. Green. Re: Microfiltration conceptual design/costing estimates. (Bates# DES 804 - 878 | 142 | |
| 15 | Various notes and calculations from K. Boehmer file. (Bates# DES 1326 - 1413 | 144 | |
| 16 | 2/8/94 memorandum from E. Shannon to Eric Schubert. Re: Microfiltration. Prepared for SCGC on microfiltration costs | 147 | |
| 17 |
9/22/93
memorandum from K. Boehmer to E. Shannon.
Re: Microfiltration Specs. (Bate# DES 652) |
152 | |
| 18 | 2/10/94 memorandum from E. Shannon to E. Schubert. Re: Estimate of man years of work created by construction of microfiltration facilities | 152 | |
| 19 |
10/27/93
telephone conversation record between K. Boehmer and J. Ward.
Re: What is an appropriate number for loss production? |
153 | |
| 20 | 10/4/93 telephone conversation record between K. Boehmer and J. Vickes. Re: Technical memo comments | 157 | |
| 21 | 10/13/93 memorandum from K. Boehmer to KBN Engineering requesting spread sheet files on Dr. Walker's data. (Bates# DES 649) | 157 | |
| 22 | 8/19/93 memorandum fax from K. Boehmer to KBN Engineering. Re: Microfiltration bends program work plan for the SCGC. (Bates# DES 653-4) | 158 | |
| 23 | 8/16/93 telephone conversation record for K. Boehmer with J. Arieta. Re: Measurement system used to determine the flow of water in Flor-Ag site | 159 | |
| 24 | 11/1/93 telephone record for K. Boehmer with J. Arieta. Re: Phosphorus sampling, loadings and data gaps | 160 | |
| 25 | 8/23/93 telephone conversation note on a memorandum pad, from K. Boehmer to C. Durrell at the Co-op. Re: Pre-baseline monitoring data, EAA | 161 | |
| 26 | Telephone conversation record note written by K. Boehmer regarding a voice mail message he left S. Lavinder on 10/29/93 and S. Lavinder subsequent call back to him. Re: Memo invoicing. ( 9/27/93 | 164 | |
| 27 | 10/29/93 technical memorandum from E. Shannon and K. Boehmer to W. Green. Re: Microfiltration conceptual design/costing estimates | 167 | |
| 28 | 9/30/93 draft copy of the first technical memorandum from K. Boehmer to E. Shannon. Re: Markup general comments | 169 | |
| 29 | 10/29/93 draft version copy of the second technical memorandum with comments from J. Lozier. | 170 | |
| 30 | 12/3/93 copy of a memorandum to S. Lavinder from K. Boehmer and S. Lavinder's handwritten notes on the memorandum, that he returned to K. Boehmer | 170 | |
| 31 | 9/30/93 draft copy of the first technical memorandum. Re: Marked up by J. Lozier of the Gainesville office | 171 | |
| 32 | 9/30/93 draft version technical memorandum. Re: Marked up with S. Lavinder comments | 171 | |
| 33 | 9/30/93 draft copy of the first technical memorandum. Re: Marked up with comments from A. Muniz and J. Curtis of the Deerfield Bch office | 172 | |
| 34 | Pages from the first technical memorandum. Re: Marked up by J. Lozier. Second revision of a second draft. | 172 | |